I uploaded a @YouTube video http://t.co/3kg5ddwZ Blood and Tissue Bank 14 weeks 5 days ago
I uploaded a @YouTube video http://t.co/j9BIdnQh All Seasons Hotel 14 weeks 5 days ago
SBChallenge project video: A Grander View http://t.co/0CBFkG06 via @youtube 14 weeks 5 days ago
SBChallenge11 proceedings - now available http://t.co/u2qhjmIA via @AddThis 14 weeks 5 days ago
I uploaded a @YouTube video http://t.co/xNxFn6Jl Public Nursery "S. Dissegna" 14 weeks 4 days ago
I uploaded a @YouTube video http://t.co/Vp2i7Vsk EcoCOOP supermarket 14 weeks 4 days ago
I uploaded a @YouTube video http://t.co/WALFsODw Eco//nnect 14 weeks 4 days ago
I uploaded a @YouTube video http://t.co/5F2wpNDs Energy-Plus Primary School 14 weeks 4 days ago
I uploaded a @YouTube video http://t.co/3UuP5HP0 ETSAV Student Residence 14 weeks 4 days ago
I uploaded a @YouTube video http://t.co/gsPhHfPc Frontier Project 14 weeks 4 days ago

SB Method and SBTool

  • The SB Method is a generic framework for rating the sustainable performance of buildings and projects. It may also be thought of as a toolkit that assists local organizations to develop SBTool rating systems;
  • The SB Method can be used by authorized third parties to establish adapted SBTool versions as rating systems to suit their own regions and building types;
  • It can also be used by owners and managers of large building portfolios, to express in a very detailed way their own sustainability requirements to their internal staff or as briefing material for competitions;
  • The system covers a wide range of sustainable building issues, not just green building concerns, but the scope of the system can be modified to be as narrow or as broad as desired, ranging from 100+ criteria to half a dozen;
  • SB Method takes into account region-specific and site-specific context factors, and these are used to switch off or reduce certain weights, as well as providing background information for all parties;
  • Weighting is at one level and can be partly modified by authorized third parties;
  • The system is set up to allow easy insertion of local criteria and/or language;
  • It includes IDP process steps;
  • It handles all four major phases;

    • new and renovation projects or a mix;
    • up to five occupancy types in a single project;
    • handles buildings up to 100 floors in height;
    • provides relative and absolute outputs;